Coordination Meeting with Architect Idris
Chairman: Dato' Paduka Hj Idris
Matter discussed:
1. To be working on schematic M&E design and section for the building
2. Preliminary discussion should be done with BOMBA before proceeding to detail design
3. Discuss with BOMBA for fire fighting in high rise building
4. To confirm the usage of current M&E plant for Women & Child
5. To determine the size of AHU, the door and vertical riser
6. To determine the needs of special requirements
7. Conceptual M&E design to be submitted in August for approval