Wednesday, August 22, 2007

31 July 2007

SIte Visit to the existing M&E palntroom for RIPAS Hsopital with Hj Hisham (Mechanical Engineer)
1. Water tank location
2. Medical Gases plantroom
3. Liquid Oxygen Tanl location
4. Kitchen
5. Services Tunnel

26 July 2007

Coordination Meeting with Architect Idris
Chairman: Dato' Paduka Hj Idris
Matter discussed:
1. To be working on schematic M&E design and section for the building
2. Preliminary discussion should be done with BOMBA before proceeding to detail design
3. Discuss with BOMBA for fire fighting in high rise building
4. To confirm the usage of current M&E plant for Women & Child
5. To determine the size of AHU, the door and vertical riser
6. To determine the needs of special requirements
7. Conceptual M&E design to be submitted in August for approval

25 July 2007

CCTV Project- Tender Document preparation
Title: Supply & Install Integrated Security Monitoring System (IDS, CCTV and Access Control) for Berakas Camp and for all MINDEF Camps in Brunei

Briefing by: Hj Baharuddin
Project team:
1. Pengiran Kamarulzaman - Coordinator
2. Hairul Anaur M Sahray - Project Manager
3. Art Perez - member
4. Glenn - member

Closing date: 7 August and 31 August 2007

17 and 18 July 2007

Cooling Load Calculation on HVAC System for Penempatan Semula Jabatan Adat Istiadat Negara project

10, 11 and 12 July 2007

Prepare study report of Feasibility Study of HVAC System Upgrade for Brunei Shell Petroleum (BSP) Head Office, Seria

9 July 2007

Meeting with Building Engineering & Support Service RIPAS, Architect and BPMS @ RIPAS

Matter discussed:
1.Water tank
2.Oxygen tank
3.Electrical supply
4.Electrical backups
5.Genset
6.Vacuum pumps
7.Air-conditioning
8.Negative pressure
9.Waste system
10.Laundry system
11.Fire services
12.Fire alarm
13.Nurse call
14.Gas system
15.Lighting
16.CCTV
17.TV system
18.Decorative light
19.Building maintenance room

6 July 2007

Site visit with Ding to M&E plant RIPAS. Survey new route for new M&E plant