Wednesday, August 22, 2007

31 July 2007

SIte Visit to the existing M&E palntroom for RIPAS Hsopital with Hj Hisham (Mechanical Engineer)
1. Water tank location
2. Medical Gases plantroom
3. Liquid Oxygen Tanl location
4. Kitchen
5. Services Tunnel

26 July 2007

Coordination Meeting with Architect Idris
Chairman: Dato' Paduka Hj Idris
Matter discussed:
1. To be working on schematic M&E design and section for the building
2. Preliminary discussion should be done with BOMBA before proceeding to detail design
3. Discuss with BOMBA for fire fighting in high rise building
4. To confirm the usage of current M&E plant for Women & Child
5. To determine the size of AHU, the door and vertical riser
6. To determine the needs of special requirements
7. Conceptual M&E design to be submitted in August for approval

25 July 2007

CCTV Project- Tender Document preparation
Title: Supply & Install Integrated Security Monitoring System (IDS, CCTV and Access Control) for Berakas Camp and for all MINDEF Camps in Brunei

Briefing by: Hj Baharuddin
Project team:
1. Pengiran Kamarulzaman - Coordinator
2. Hairul Anaur M Sahray - Project Manager
3. Art Perez - member
4. Glenn - member

Closing date: 7 August and 31 August 2007

17 and 18 July 2007

Cooling Load Calculation on HVAC System for Penempatan Semula Jabatan Adat Istiadat Negara project

10, 11 and 12 July 2007

Prepare study report of Feasibility Study of HVAC System Upgrade for Brunei Shell Petroleum (BSP) Head Office, Seria

9 July 2007

Meeting with Building Engineering & Support Service RIPAS, Architect and BPMS @ RIPAS

Matter discussed:
1.Water tank
2.Oxygen tank
3.Electrical supply
4.Electrical backups
5.Genset
6.Vacuum pumps
7.Air-conditioning
8.Negative pressure
9.Waste system
10.Laundry system
11.Fire services
12.Fire alarm
13.Nurse call
14.Gas system
15.Lighting
16.CCTV
17.TV system
18.Decorative light
19.Building maintenance room

6 July 2007

Site visit with Ding to M&E plant RIPAS. Survey new route for new M&E plant

4 to 5 July 2007

Calculation for the open area for the new layout of Women & Child project for HVAC design

3 July 2007

1. Study dehumidification design
2. Study humidity problems and matters at operation theatres

Tuesday, August 21, 2007

30 June and 2 July 2007

HVAC and Medical Gas requirement study

Monday, August 20, 2007

29 June 2007

Meeting with Brunei Shell Petroleum (BSP) Seria, Kuala Belait, regarding the feasibility study of upgrading the air-conditioned system for BSP HQ

28 June 2007

Study the HVAC and Medical Gas system requirements for hospital project

27 June 2007

1. Compile documents of HVAC, Medical Gas and Plumbing & Sanitary for reference
2. Discussion with Hj Mohammad, director of ISDS ( ICT wing for BPMS) on possibility to set-up a Maintenance & Support Service Contract with existing hospital.

26 June 2007

1. Estimated expenditure brief report for Women & Child project
2. Study energy design resource
3. Study general HVAC system requirement for hospital

23 and 25 June 2007

1. Review the Medical Gas design and requirement
2. Study the location @ Women & Child that to be provided with Medical Gas facility
3. Study on the suitable size, model and specification of the Medical Gas System to be used in this project

22 June 2007

1. Checked and determined each rooms requirement for the Women & Child project
2. Waiting for architects to confirm the total beds issue

21 june 2007

1. Calculation - continue
2. Basic lift load calculation fow Women & Child project
3. All calculation submitted and checked by Snr Mechanical and Electrical engineers

20 June 2007

1. calculate the area to be air-conditioned @ new Women & Child Hospital base on the latest drawin given by architect
2. Determine the AHU room fro each floors
3. Locating the chiller plant room base on the drawing - Basement 1

Sunday, August 19, 2007

19 June 2007

1. Review the previous basis design for the proposed Accident & Emergency Block, RIPAS - project delayed due to budgetary matters
2. Coordination meeting with Architect Idris (prime consultant)- Chairman, Dato' Idris brief on the latest design and layout

First Day

18 June 2007

First day working @ Brunei...

1. Briefing given by Eudy Bermudez ( Senior Mechanical Engineer) regarding Women & Child Hospital Project
2. Site visit with site supervisor, Ding, to Raja Isteri Perempuan Anak Saleha (known as RIPAS) Hospital M&E plantroom
3. Study the report of the Women & Child project and relocating M&E plantroom project
4. Briefing by the BPMS boss Hj Baharuddin